Project timeline planner


Put your own dates and stage durations into one timeline you can print or copy: design, sample, approval, production and freight.

Short answer: type a start date, or the date you need it by, and how long each stage takes for you. The page adds no lead time of its own; the figures ArtzFolio has published are shown beside each stage, word for word, and you decide whether to use them. Everything you type or choose here stays in your browser. Nothing is uploaded, saved on our servers or sent anywhere.

How to use this in 3 steps

  1. Choose whether you know the start date or the date you need it by, and pick the date.
  2. Type how long each stage takes, or press a published figure next to the stage. Leave unknown stages empty.
  3. Print the timeline, copy the list or download the CSV.

Your dates and stages

What do you know?

Type how long each stage takes for you. Leave a stage empty if you do not know; it is then left out and the total is incomplete. Stages run one after another. Business days skip Saturdays and Sundays; public holidays are not known and are not skipped.

Enquiry and reply

Published (Facts page): “We reply within 1 business day, with questions or a quote.”

Design and development

No duration published. Type your own, or ask us.

Sample

Published (Facts page, paid sample): “Typically 1 to 2 weeks.”

Your approval of the sample

Your own time to check. Published (Samples page): the full run is “not made until you approve the sample”. No duration is published.

Production run

Published (Facts page, bulk run): “Typically 3 to 4 weeks after sample approval and the 50% advance.”

Freight and delivery

Published (Facts page, shipping): “EXW Noida (ex-works); we assist with the logistics.” Not published as a time for freight: you arrange it.

Choose a start date.

Your timeline

-

StageStartsEndsHow long
1. Enquiry and reply---
2. Design and development---
3. Sample---
4. Your approval of the sample---
5. Production run---
6. Freight and delivery---

Simple list

  1. Enquiry and reply: -
  2. Design and development: -
  3. Sample: -
  4. Your approval of the sample: -
  5. Production run: -
  6. Freight and delivery: -

Dates are worked out only from the durations you typed. The published figures beside each stage are typical, not a guarantee, and are confirmed in your written quote.

What ArtzFolio has published about time

ItemPublished wordingWhere
Quote responseWe reply within 1 business day, with questions or a quote.Facts
Lead time (paid sample)Typically 1 to 2 weeks.Facts
Lead time (bulk run)Typically 3 to 4 weeks after sample approval and the 50% advance.Facts
ShippingEXW Noida (ex-works); we assist with the logistics.Facts
Design, your approval, freight timeNo duration is published. Ask us.How it works

Terms are typical, not a guarantee, and are confirmed in your written quote. See the lead times explained guide for where the clock starts. This page adds no lead time of its own.

Sources: published Facts and Samples pages (wording quoted as published, as of 2026-11-12). No design, approval or freight duration is published, so none is supplied. Date arithmetic only.